Librapix Link

Scotland's Rig Yards

Upload a Picture | About this Site | Links | Random Pic | Advanced Search Home | Latest Additions | Contributors | Visitors
 
Ninian Central Construction - 4
Scotland's Rig Yards
 No: 123   Contributor: L J Bonner   Year: 2010   Manufacturer: Kishorn
Ninian Central Construction - 4

Ninian Central nearing competition. Like an iceberg, most of the structure is under water.
Picture added on 02 August 2010 at 22:58
This picture is in the following groups
Ninian Central
Comments:
I believe this photo is in 1977, I am probably on the scaffold below the main working deck. We were a team of concrete finishers from North Wales, a father and three sons, the rig was towed out on 08/09/1978, we had traveled the 526 mls up to find out we had been paid off, and the notices were in the post, but the firm invited us to stay for the next fortnight. We went up Applecross mountain and watched the tow from there.

We were later asked back to help concrete ballast the Maureen platform. the first day back we were setting up for the job when a storm blew up and the gantry sank, we eventually got off the rig at 1.15 am the management kindly gave us an extra lie in, they told us we could start 30 mins later, all heart.

Between the three gangs we poured 51, 000 tons in 49 days. One of my fondest memories is the last trip on the boat after your tour, the captain of the Highland Seabird would play Rod Stewart's 'We are sailing' and we would toss our safety helmets in the loch. There must have been a 100, 000 of them issued.

Does anybody remember the t shirts with the motiff THE BIGGEST ERECTION IN SCOTLAND, KISHORN 1978? Very happy days.

Added by John Sullivan on 12 September 2010.
Do you know who the captain was? Sounds like my dad who was one of the captains that did that run.

Added by MacDonald on 12 September 2011.
John
I remember the 'T shirts'. I had one but not sure where it is now. Remember the good times on and off (Inverness etc etc) the base camp. Was there early on in in my career (Structural Engineer).
From the Dry Dock onwards. Been and worked for Esso in the Bass Strait off Victoria, Australia. Only baby platforms down there. Still here in Australia, remember winter time up there at Kishorn.

Added by Dr. Carey B. Collins on 29 September 2011.
i worked for the firm doing the precast concrete dome segments.

Added by Jim Lingwood on 31 December 2011.
Please add your comments about this picture using the form below.

Comments

Your Name

Your email address - this will be shown on the page and will allow the system to notify you of further comments added to this picture.
 

Kishorn

Kishorn 1982-1983?GATHERING OF THE KISHORN COMMANDOSVisit from HRH Prince Charles to the MaureenFloating the Maureen outNinian Central, Kishorn Yard.Ninian CentralNinian CentralNinian CentralKishorn Shop 19Maureen Hideck, Kishorn
My Album Admin Login | Terms & Copyright